PUYANG ZHONGSHI GROUP CO.,LTD
PUYANG ZHONGSHI GROUP CO.,LTD
Home > Zhongshi News

How To Install The Casing Centralizer?

Jul. 26, 2018

The spacing of the casing centralizer shall meet the construction design requirements, and the outer diameter of the centralizer to be selected shall be determined according to the wellbore. Let me tell you how to install the casing centralizer?

1. Can be placed directly on the sleeve.

2. Can be mounted to move freely between the casing coupling and the coupling.

3. Can be mounted on any part of the bushing with a retaining ring. When installing, the centralizer is buckled on the sleeve, and the upper and lower pins are inserted into the hoop, the lock pin is flattened or the pin is bent to prevent the pin from exiting, and the inspection is correct and then enters the well.

We have PVC Centralizer, Rotating Centralizers, Composite Centralizer and other Centralizer products, if you want to continue to know about the centralizer, you can contact us.

Rotating Centralizers

Hot Products

CONTACT US
  • E-mail:
    sales@pyzs-group.com
  • TEL:
    +86 22 2345 6997
  • Address:
    Mazhuangqiao Industry Zone, Puyang City, Henan Province, China.
Follow us
  • Copyright © Puyang Zhongshi Group Co., Ltd. All Rights Reserved
  • Sitemap
  • Technical Support:
Online Services
1